|
|
Revisions 6/21/25: Completed
full conversion of RockWorks Training Manual. |
||
|
Table of Contents |
Duration (Minutes) |
PowerPoint |
|
|
19 |
n/a |
||
|
1.0 Overview |
4 |
||
|
3 |
|||
|
6 |
|||
|
1 |
|||
|
1.3.1 Using Google Earth to Verify
Project Dimensions |
|
|
|
|
5 |
|||
|
25 |
n/a |
||
|
2.0 Introduction |
3 |
||
|
4 |
|||
|
5 |
|||
|
4 |
|||
|
3 |
|||
|
2.4.1 Sections versus Profiles |
|
|
|
|
2 |
|||
|
5 |
|||
|
2.7 Exploring
Additional Options for Plotting P-Data & I-Data |
2 |
||
|
3. Creating
Stratigraphic Models & Diagrams from Borehole Data |
15 |
n/a |
|
|
4 |
|||
|
2 |
|||
|
3 |
|||
|
3 |
|||
|
4 |
|||
|
9 |
|
||
|
4.1 Creating a
Lithology Model (4 Minutes) |
4 |
||
|
4.2 Creating a
Lithology Fence Diagram (3 Minutes) |
3 |
||
|
3 |
|||
|
20 |
|
||
|
6 |
|||
|
3 |
|||
|
3 |
|||
|
4 |
|||
|
4 |
|||
|
10 |
|
||
|
3 |
|||
|
4 |
|||
|
3 |
|||
|
8 |
|
||
|
7.0 Introduction |
1 |
||
|
3 |
|||
|
4 |
|||
|
13 |
|
||
|
4 |
|||
|
3 |
|||
|
2 |
|||
|
3 |
|||
|
2 |
|||
|
10 |
|
||
|
1 |
|||
|
4 |
|||
|
5 |
|||
|
5 |
|
||
|
2 |
|||
|
2 |
|||
|
10.3 Draping an
Aerial Photo Over a Grid Surface in RockPlot3D |
2 |
||
|
5 |
|||
|
8 |
|
||
|
12.1 Creating a
Triangulated Contour Map of Groundwater Elevations |
4 |
||
|
5 |
|||
|
13 |
|
||
|
13.1 Creating a
T-Data Histogram, Color Table, & Contaminant Plume Map |
6 |
||
|
13.2 Creating a
Playlist to Generate a Contaminant Plume Migration Video |
6 |
||
|
17 |
|
||
|
14.0 Introduction |
1 |
||
|
2 |
|||
|
14.2 Appending a
Lithology Model to a Contaminant Isosurface Diagram |
2 |
||
|
2 |
|||
|
2 |
|||
|
14.5 Appending
Maps |
2 |
||
|
1 |
|||
|
3 |
|||
|
2 |
|||
|
7 |
|||
|
16. Picking Lithology
& Stratigraphy from Borehole Striplogs |
|
|
|
|
16.1 Picking Lithologic Intervals from Borehole
Striplogs |
|
|
|
|
16.2 Picking Stratigraphic Intervals from
Borehole Striplogs |
|
|
|
|
4 |
|||
|
Total |
176 |
2.9 hrs. |
|