JuDi 0 Report post Posted June 11, 2014 Any chance to take control points outside project dimensions into account when gridding a stratigraphic horizon for example? Or is this done anyway by default if a borehole is enabled? Thanks, Julia Share this post Link to post Share on other sites
Molly 0 Report post Posted August 11, 2014 Hi Julia, This would be done anyway: if a borehole is enabled its data will be sent to the modeling routine, even if it does not lie within the current gridding extents. To have the hole NOT be used in modeling, you would need to disable the hole. Molly Mayfield RockWare Inc. Share this post Link to post Share on other sites