Jump to content
RockWare Support Forum
Lize

Creating a model with borehole logger data

Recommended Posts

I have recently profiled about 90 boreholes in an area with a down the hole borehole logger. The data that was captured for each borehole includes: Depth, Date, Time, Specific Conductivity, pH, DO, ORP and Temperature.

Is there any way I can input this data into Rockworks 15 and create a model?

Share this post


Link to post
Share on other sites

Hi Lize,

If the date and time are not important, you can enter the data in the P-Data tab, or import it from Excel.

If you want to filter the data by date and time, enter the data on the T-Data tab. This method requires a top and bottom depth for each sample interval, but you can use the same depth for both values.

Thanks,

Tom B

RockWare Inc

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×