Jump to content
RockWare Support Forum
Amy_

Calculation of Charge Balance using GSS

Recommended Posts

Hi Tom,

When you calculate charge balance using GSS a screen pops up with two options:

Treat zero values as no data

and

Treat less than values as no data

If these boxes are not checked how does GSS handle zero values and less than values when calculating charge balance?

Thanks,

Amy

Share this post


Link to post
Share on other sites

Hi Amy:

The boxes work as follows:

Treat zero values as no data:

  • if checked, values are ignored
  • if left unchecked, a zero value is used

Treat less than values as no data:

  • if checked, values are ignored
  • if left unchecked, the value after the '<' symbol is used, as with unit conversion. For instance, if value is '<.1', then a value of .1 is used.

You can always check how the calculation is going to proceed by choosing the same options in the Analysis - Launch feature, and seeing how the data are actually entered within the SpecE8 module.

I hope that helps,

Tom Meuzelaar

RockWare, Inc.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×