Jump to content
RockWare Support Forum

trchanity

Members
  • Content count

    3
  • Joined

  • Last visited

Everything posted by trchanity

  1. Hello, How can I set a fractured zone by using MINC inside an established model in PetraSim? For example, I want to set a 2600m×170m×700m fractured reservoir inside a 9000m×6000m×6000m conceptual EGS model. Is there any other solution(except MINC) to solve this problem?
  2. I developed natural state model and have conducted production prediction simulation with PetraSim. I want to output the future production rates of 30 years. Actually, I'm using "Well on Deliv" function but I do not know clearly the meaning of the option of "pressure", does it mean "bottomhole pressure" as the TOUGH2 manual says? In addition, as we know the value of bottomhole pressure is not constant, so is there any solution for wellbore-reservoir coupling in PetraSim for precisely future production rates?
  3. Wellbore-Reservoir Coupled

    Hi Alison, Thank you for your reply.I'll have a try. Best Regards Tairu
×