Clutchdutchman
-
Posts
2 -
Joined
-
Last visited
Posts posted by Clutchdutchman
-
-
Anyone run into a problem or could shed some light on this for me. While trying to import a large p-data set with multiple soil borings from Excel, I only get it in part with holes in the data or certain depths missing completely. The problem doesn't occur when I stick to one depth.
Excel data partial import
in RockWorks
Posted
It's on RW17